Commit Graph

4 Commits

Author SHA1 Message Date
Jean-Philippe Lang 4bcba6a094 Adds support for saturday as the first week day (#7097).
git-svn-id: svn+ssh://rubyforge.org/var/svn/redmine/trunk@5228 e93f8b46-1217-0410-a6f0-8f06a7374b81
2011-04-16 16:11:47 -07:00
Eric Davis c31a671973 Added a setting to configure the day that week start on (Monday or Sunday). (#4363)
git-svn-id: svn+ssh://rubyforge.org/var/svn/redmine/trunk@3166 e93f8b46-1217-0410-a6f0-8f06a7374b81
2009-12-13 04:06:55 +00:00
Jean-Philippe Lang fe28193e4e Merged Rails 2.2 branch. Redmine now requires Rails 2.2.2.
git-svn-id: svn+ssh://rubyforge.org/var/svn/redmine/trunk@2493 e93f8b46-1217-0410-a6f0-8f06a7374b81
2009-02-21 11:04:50 +00:00
Jean-Philippe Lang ec51cdd0f9 Calendar:
* added an helper and moved the rendering code to a shared partial (used by project calendar and my calendar)
* first day of week can now be set in lang files (general_first_day_of_week)

git-svn-id: http://redmine.rubyforge.org/svn/trunk@815 e93f8b46-1217-0410-a6f0-8f06a7374b81
2007-10-07 20:07:11 +00:00